Where commercial coatings earn their keep
How commercial projects get scoped
Square footage sets the scale, but the spec comes from three questions: What drives or walks on it? (forklifts and pallet jacks demand thicker builds than foot traffic), what spills on it? (the chemical profile chooses the resin family and topcoat), and how long can it be down? Fast-cure polyaspartic systems exist precisely because a warehouse aisle or restaurant kitchen can't sit empty for a week — phased and off-hours installs are normal practice for commercial crews. Moisture testing is non-negotiable on older slabs, and large floors get quoted after a site visit, never from a photo alone.
Pricing, honestly framed
Commercial coatings are quoted per project, and any per-square-foot figure offered without seeing the slab is a guess in a costume. What drives the number: total area (per-foot costs fall as area grows), prep condition and repair volume, system build and topcoat chemistry, and the install window — nights and weekends cost more than a closed-for-renovation week. Use the quote form with your space's rough dimensions and use case, and the matched provider will schedule a walk-through and quote it exactly.
Related pages
All floor coating services · Prep, grinding & crack repair · Polyaspartic coatings · Garage floor epoxy
Tell us about the space
Choose "Not a garage (commercial / other)" for size on the form, and put the rough dimensions and use in the project details.
Educational note: any cost ranges mentioned on this site are typical, general information only. Your installer confirms an exact quote directly with you before work begins.